• SINOCONST (Shanghai) Steel Structure Co., Ltd.

News

Director of the company, Mr. Wang Cheng-jun, went to Qatar to study the project



 

May 16 to 23, SINOCONST (Shanghai) Steel Structure Co., Ltd. (hereinafter referred to as "SINOCONST") Chairman Wang Cheng Jun was invited to hold consultations with the project owner and the General Contractor on the project management.


Mr. Wang expressed his satisfaction that all the managers of the Luthier Project Department were able to organize construction management in accordance with the construction node in an orderly manner under the adverse conditions such as difficult site environment, difficult construction management and complex foreign environment. Mr. Wang put forward higher requirements for quality management of the Project Department. Party members and staff members raised the foresight of construction, prepared well in advance, and minimized the cost of construction.


In addition, Wang Cheng Jun organized a meeting of the Party members of the Luxel Project Branch to hold a meeting of the Party members, and pointed out that the task of project production is difficult, and that the Party members and comrades should give full play to the pioneering leading role of the Party members. The secretary of the Party branch of the project shall serve the working people, care for the younger generation, care for the life of the domestic and foreign frontline workers, and pay attention to heat prevention and cooling. Always keep in mind that from the masses to the masses, increase the cohesiveness and effectiveness of the project and ensure the successful completion of the Lusel project.


In the end, Wang Cheng Jun once again stressed that the project is at a critical stage, approaching a high temperature of nearly 50 degrees, and the project is about to enter the construction peak of 500 people.